For over 55 years, Litman Excavating has been providing specialized construction services to meet the demands of our customers.
Utilizing pipeline trenchers by means of producing a clean, flat bottom ditch for various pipeline installations reducing trenching time of conventional methods. We have available rock trencher capability options from 50,000 lb. to 100,000 lb.
We have worked with various manufacturers and engineering firms on multiple styles and configurations of Specialized Engineered Wall Systems. Some various systems include H-beam and lagging, stacked blocks (engineered) and gabion baskets.